Traffic

Nov 16, 2012 6:01 PM by Siera Santos, ssantos@koaa.com

Street repairs starting Nov. 19 in Colorado Springs

The following are potential road restrictions from Nov. 19 - 23 between 6:00 a.m. and 6:00 p.m. and are subject to change because of weather conditions, equipment failure and resource scheduling changes.

 

City Asphalt Repair Work:

  • 3905-3925 Half Turn Pl (Edgeline)
  • Siferd Blvd and Rosalie St (Minor Digout)
  • Parkside Dr and Pikes Peak Av (Minor Digout)
  • Barkman Cir and Angelina Dr (Minor Digout)

**Note: Work could possibly have traffic shifted to one lane**

 

 

Drainage Repair Work:

  • Douglas Creek and Vondel Park Dr (Slope Erosion)
  • Broadmoor Hills Dr (Channel Cleaning)

**NOTE: Work could possibly have traffic shifted to one lane**

 


City Concrete Repair Work:

  • 1701 Cascade Av N Address (Sidewalk/Curb/Gutter)

**NOTE: Work could possibly have traffic shifted to one lane**

 


PPRTA Concrete Repair Work:

  • Fontmore Rd Mesa Rd to 30th St
  • Chelton Rd Jet Wing Dr to Hancock Expwy
  • Rangewood Dr Woodmen Rd to Austin Bluffs Pkwy

**NOTE: Work could possibly have traffic shifted to one lane**

 

»Comments

Most Popular

Top Videos